Installing The Chassis Into An Equipment Cabinet - Dell E1200i ExaScale Installation Manual

Hide thumbs Also See for E1200i ExaScale:
Table of Contents

Advertisement

Installing the Chassis into an Equipment Cabinet

Install the E1200 system after you secure the rack shelf bar. Load the chassis in the lower half of the
cabinet to avoid it becoming top-heavy. Make sure the cabinet is positioned with adequate space in the
front, rear, and sides of the unit for proper ventilation, access to cables, and access for maintenance.
Refer to
Chapter 3, Site Preparation
To install the chassis into an equipment cabinet:
Step
Task
Install the equipment rack shelf bar.
1
Adjust the chassis mounting brackets to the desired front-rear position and add a 23-inch adapter brackets as
2
required.
Using a hand cart, pallet jack, or forklift, align the rack-mount holes with the cabinet holes.
3
Insert rack-mounting screws in the holes that are not obscured by the metal chassis shipping cover. Tighten the
4
screws.
Loosen and remove the screws attaching the chassis shipping cover. Remove the shipping cover.
5
Insert the remaining mounting screws and tighten to secure the chassis in the cabinet.
6
26
|
Installing the DC Chassis
for complete requirements.

Advertisement

Table of Contents
loading

Table of Contents