Powering Up; Preparation - Dell E1200i ExaScale Installation Manual

Hide thumbs Also See for E1200i ExaScale:
Table of Contents

Advertisement

Powering Up

This chapter provides instructions for powering up your E1200 AC or DC system after you have installed
all the chassis components and made your power and network connections. It covers the following topics:

Preparation

Supplying Power - AC
Supplying Power - DC
Booting to the CLI Prompt
Preparation
NOTE: Make sure that the switch on the remote power source is in the OFF position until you are ready to
supply power to the chassis.
Before you supply power to your chassis, re-inspect your equipment rack and chassis.
Verify that:
• The equipment rack is properly secured and grounded.
• The chassis is bolted and secured into your equipment rack.
• The chassis is grounded.
• Each power supply module is properly installed and secured.
• The AC-Cord Retainer is installed on AC systems.
• The power switch is in the OFF position for DC systems, and STANDBY for AC systems.
• Power cables connect to a compliant remote power source.
• Both fan trays are installed and secured.
• All line cards, RPMs, and SFM3s are properly installed and secured.
• All chassis slots are filled. Blank panels and covers are installed in all empty slots.
WARNING: Leakage Current (High Touch Current): The AC power cords are secured to the power inlet using
the provided bracket. The power cord plugs must be secured to the building outlets by the chassis installer or
a qualified electrician.
11