Figure 2-6 Attaching The Front Of Handle To Chassis - HP Integrity rx7640 Installation Manual

Hp integrity rx7640 and hp 9000 rp7440 servers installation guide
Hide thumbs Also See for Integrity rx7640:
Table of Contents

Advertisement

Installing the Server
Lifting the Server Cabinet Manually
Step 6. Align the screw holes in the handle's front flange with the rack mounting holes in the server's rack
mount flange. Secure with the two thumbscrews. See Figure 2-6 on page 50.

Figure 2-6 Attaching the Front of Handle to Chassis

Step 7. Repeat steps 2—4 to install the other handle on the other side of the server.
Step 8. After handles are secured, server is ready to lift.
Step 9. Handles are removed in reverse order of steps 2—4.
Step 10. After moving the server, remove the lift handles from the chassis.
Step 11. After the server is secured, replace the previously removed cell boards and bulk power supplies.
Step 12. Reinstall the side covers and front bezel.
50
Thumbscrews
Chapter 2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9000 rp7440

Table of Contents