Installing The Upper Handle; Installing The Traction Control Linkage - Toro Power Max 724 OE Operator's Manual

Hide thumbs Also See for Power Max 724 OE:
Table of Contents

Advertisement

1

Installing the Upper Handle

Parts needed for this procedure:
2
Handle bolts
2
Curved washers
2
Locknuts
Procedure
1. Lift and rotate the upper handle and position it over
the lower handle (Figure 3).
2. Install 2 handle bolts, 2 curved washers, and 2 locknuts
in the lower handle holes (Figure 3).
g019003
Figure 3
2
Installing the Traction Control
Linkage
No Parts Required
Procedure
1. Remove the hairpin cotter and washer from the lower
end of the speed control rod and insert the lower end
of the rod into the lower link arm so that the bent end
of the speed control rod faces rearward (Figure 4).
g019004
2. Secure the lower end of the speed control rod with the
washer and hairpin cotter that you previously removed.
3. Remove the hairpin cotter and the outer washer from
the trunnion on the upper end of the speed control
rod (Figure 5).
1. Speed selector lever
2. Trunnion
Note: To make installation easier, leave the flat washer
on the trunnion (Figure 5).
4. Shift the speed selector lever into Position F6.
8
Figure 4
Figure 5
3. Inner washer
4. Outer washer

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

37770

Table of Contents