Valor Arden Operating & Installation Manual

Hide thumbs Also See for Arden:

Advertisement

Operating & Installation Manual
Arden
Stove
PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE
BK018
Rev 07
February 2008
Parts No: AFS1080
EN 13240:2001
07

Advertisement

Table of Contents
loading

Summary of Contents for Valor Arden

  • Page 1 Operating & Installation Manual Arden Stove PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE BK018 Rev 07 February 2008 Parts No: AFS1080 EN 13240:2001...
  • Page 2 Valor Ltd This booklet has copyright & may not be copied in whole or part or be used for any purpose other than that for which it is supplied without express written consent from Valor Limited. Page 2 Arden Stove...
  • Page 3: Table Of Contents

    Lighting The Fire Sealing of Terminals Reduced burning Flues & Chimneys 9 -12 Over-Firing & Chimney Fires Final Check Multi-purpose operating Tool Building Control consent Checklist Air Inlet Controls Spare Parts List Guarantee Final Factory Check List Arden Stove Page 3...
  • Page 4: Safety Notices

    • Avoid upper body/top heavy bending. Do Valor stoves are also fitted with an ‘air wash’ so not lean forwards or sideways when called because it provides a curtain of high handling the fire speed preheated air behind the glass to help •...
  • Page 5: Check List

    Part Description & Visual Aid (not to scale) Quantity 1. Fuel grate 2. Feet & Fixings 3. Throat Plate 1 (4”) 4. Flue Spigot 1 (4”) 5. Hot Plate 6. Ash Pan 7. Operating Tool 8. Rear Liner 9. Side Liners 10. Instructions Arden Stove Page 5...
  • Page 6: Technical Data

    Rear - 700 Combustible Material (mm) Side - 500 Height (mm) Width (mm) Depth (mm) Height to centre of rear flue (mm) Depth from back to centre of flue (mm) Flue diameter (mm) 102 (4”) Weight packed (Kg) Arden Stove Page 6...
  • Page 7: Installation

    Asbestos Air for combustion All Valor stoves contain no asbestos in there There must always be a permanent means of manufacture of construction. If there is a possibility of providing air for combustion into the room in which disturbing any asbestos in the course of installation, the stove is installed.
  • Page 8: Fitting The Feet

    INSTALLATION Fitting The Feet The Valor Arden can be fitted with or without feet. Care should be taken whilst assembling the feet so as not to damage the painted surface of the stove. • The feet are positioned in each corner of the stove and fitted using the washers and Fig.
  • Page 9: Fitting The Flue Outlet & Hotplate

    Factory Made Insulated Chimney : Complying efficiency and poor fuel consumption. with BS 4543:Part 2 (often called “Class 1 prefabricated metal chimney”). These types of chimney should be installed in accordance with Building Regulations and BS 7566: Parts 1 to 4. Arden Stove Page 9...
  • Page 10: For All Appliances

    Details on the relevant Building Regulations and Telephone : 0845 6345626 BS British Standards are given in the “ General www.hetas.co.uk Precautions” section of these instructions. Chimneys should be as straight as possible. Horizontal runs should be avoided except where Arden Stove Page 10...
  • Page 11 Minimum 150mm (6”) Diameter Flue Maximum 150mm (6”) Horizontal Flue Section Soot Door Fire Retardant Rope Packing Maximum 100mm (4”) Brick Up Aperture Fill Void TYPICAL REAR FLUE OUTLET (as per BS 8303-1) Arden Stove Page 11...
  • Page 12 PLAN VIEW OF REGISTER PLATE AND CLEARANCES FOR NON INSULATED FLUES Combustible Register Plate. Thick (Plan View Of Steel Register Plate, 1.5mm Minimum Minimum ) 1.5mm Thick Steel. TYPICAL TOP FLUE OUTLET (as per BS 8303-1) Arden Stove Page 12...
  • Page 13: Final Check

    Please answer all the questions on the Checklist ( page 14 ) as fully as possible. Valor can not be held responsible for chimney or installation problems or faults...
  • Page 14: Building Control Consent Checklist

    I/We the undersigned confirm that the above details are correct. In my opinion, these works comply with the relevant requirements in part J of Schedule 1 of the Building regulations. Print name and title…………………………………………………………………..Profession………………………………….. Capacity……………………………………………………………………………...Telephone No. …………………………….. Address………………………………………………………………………………………………..Postcode………………….. Signed………………………………………………………………………………..Date………………………………………... Registered member of.. (e.g. CORGI, OFTEC, HETAS, NACE, NACS)…………………………………………………………. Arden Stove Page 14...
  • Page 15: Annual Maintenance

    NACS chimney engineer who will up heat slowly to gradually cure paint. provide a Certificate Of Chimney Sweeping. Note: Use genuine Valor touch up spray as some The whole flue way including the outlet must be paints interact. This could ruin the finish and swept at least twice per burning season.
  • Page 16: Summer Storage/Non Usage

    DISASSEMBLE THE AIR WASH square to the body, if not repeat above steps The Valor Arden air wash may be disassembled for cleaning or adjustment. To achieve this, the following procedure should be followed. This should only be carried out when the fire is cold and unlit •...
  • Page 17: Fire Door Glass Replacement

    The fitting of new gasket is shown below (fig. 8a) Fig. 8c Tighten nuts Fig. 8a Fitting New Door Gasket • Re-seat the new glass, ensuring the sealing gasket is flat and in contact with the glass Arden Stove Page 17...
  • Page 18: Fire Door Rope Replacement

    See fig. 8b • Just before the final end, cut the rope seal to length and glue into position. • Allow 30 minutes, before refitting the door to the appliance. Fig. 8d Rope Replacement Arden Stove Page 18...
  • Page 19: Operating Instructions

    ALWAYS WEAR SUITABLE PROTECTIVE FIRE HOUSEHOLD WASTE IN YOUR STOVE. GLOVES WHEN REFUELLING YOUR STOVE. WARNING : NEVER BURN LIQUID FUELS IN YOUR STOVE. PLEASE CONTACT : The Manufacturer For Further Details & Advice On The Use Of Other Fuels. Arden Stove Page 19...
  • Page 20: Reduced Burning

    See fig. 9 (page 21) for information. short period, 15 to 20 minutes, twice a day. Please Note : To avoid chimney problems your appliance should not be burnt at a reduced burn rate without a period of fast burning. Arden Stove Page 20...
  • Page 21: Over-Firing & Chimney Fires

    OPERATING INSTRUCTIONS AIR INLET CONTROLS OVER FIRING & CHIMNEY FIRES The Arden stove has two air inlet controls:- Do Not over fire your appliance. Using • The air wash system (so called because pre flammable liquids or too much wood or firing the...
  • Page 22: Spare Parts List

    AFS047 spigot with fixings 5. Hot plate AFGS064 16. Fire door AFS044 complete 6. Ash pan AFS058 7. Operating AFS008 tool 8. Rear Liners AFS1069 9. Side Liners AFS1068 10. Instructions AFS1080 11. Airwash AFS1077 assembly Arden Stove Page 22...
  • Page 23: Guarantee

    Fire box liner panels, Fuel retainers, Throat plate, Door rope, Door glass and gaskets are not covered by the guarantee. However should you have any problems with your appliance please contact your Valor stockist who will have the knowledge and facilities to help you.
  • Page 24: Final Factory Check List

    Final Factory Check list Stove Model ……………. …………………. Quality Finish I’ve checked it Parts and its O.K . Flue Outlet Hot Plate Grate Firebox Liners ………………………. Assembled By Throat Plate ………………………….. Checked by Air Wash Door Catches Feet & Fixings Ash Pan Operating Tool Operating &...

Table of Contents