OPERATING PROCEDURE
12. Removing the heat exchanger
(1) Remove the air intake grille.
(2) Remove the beam.
(3) Remove the side panel. (right and left)
(4) Disconnect the relay connector.
(5) Remove the under panel.
(6) Remove the drain pan.
(7) Unscrew the screws of the pipe cover, and remove the pipe
cover.
(8) Unscrew the screws of the pipe support, and remove the
pipe support.
(9) Unscrew the screw of the heat exchanger, and remove the
heat exchanger.
Remove the heat exchange with care, since this is quite
heavy. Removing work should be done with more than 2
people.
w Weight of heat exchanger : approx. 5.3kg
PHOTOS & ILLUSTRATIONS
Photo 11
Pipe
support
Screws
Pipe cover
64
Screws
Heat
exchanger