Test Run - Toshiba MMD-VNK502HEXE Installation Manual

Air to air heat exchanger with dx coil unit
Hide thumbs Also See for MMD-VNK502HEXE:
Table of Contents

Advertisement

45-EN
Air to Air Heat Exchanger with DX Coil Unit
◆ MMD-VNK1002HEXE
Standard air volume: 950m
3
/h, Lower limit air volume: 640m
50Hz 230V
500
400
Extra High
High
300
Low
200
Low
100
High
Extra High
0
0
200
400
600
800 1000 1200 1400
3
Air volume (m
/h)
◆ MMD-VN1002HEXE
Standard air volume: 950m
3
/h, Lower limit air volume: 640m
50Hz 230V
500
400
Extra
High
Low
300
High
200
Low
100
High
Extra High
0
0
200
400
600
800 1000 1200 1400
3
Air volume (m
/h)
REQUIREMENT
Use the unit between the minimum and maximum range of ventilation.
Installation Manual
3
/h, Upper limit air volume: 1140m
60Hz 220V
4.0
500
3.0
2.0
400
1.0
Extra
High
Low
High
0.0
300
-1.0
-2.0
200
-3.0
Low
-4.0
100
High
-5.0
Extra High
-6.0
0
0
200
400
600
800 1000 1200 1400
3
Air volume (m
/h)
3
/h, Upper limit air volume: 1140m
60Hz 220V
4.0
500
3.0
2.0
400
High Extra
Low
1.0
High
0.0
300
-1.0
-2.0
200
Low
-3.0
-4.0
100
High
-5.0
Extra High
-6.0
0
0
200
400
600
800 1000 1200 1400
3
Air volume (m
/h)
– 23 –
Air to Air Heat Exchanger with DX Coil Unit
15

Test Run

3
/h
Before test run
4.0
• Before turning on the power supply, carry out the
3.0
following procedure.
1. Using 500 V-megger, check that resistance of 1
2.0
MΩ or more exists between the terminal block of
1.0
the power supply and the earth (earthing).
0.0
If resistance of less than 1 MΩ is detected, do not
-1.0
run the unit.
-2.0
2. Check all valve of the outdoor unit being opened
fully.
-3.0
• To protect the compressor at activation time, leave
-4.0
power-ON for 12 hours or more be for operating.
-5.0
• Do not press the electromagnetic contactor to
-6.0
forcibly perform a test run. (This is very dangerous
because the protective device does not work.)
• Before starting a test run, set addresses following
the Installation Manual supplied with the outdoor
unit.
How to execute a test run
3
/h
For the procedure of the operation, refer to the
attached Owner's Manual. A forced test run can be
executed in the following procedure even if the
operation stops by thermo.-OFF. In order to prevent a
4.0
continuous operation, the forced test run is released
3.0
after 60 minutes have passed and returns to the usual
operation.
2.0
1.0
CAUTION
0.0
-1.0
Do not use the forced test run for cases other than the
-2.0
test run because it applies an excessive load to the
devices.
-3.0
-4.0
-5.0
-6.0
Installation Manual
Wired remote controller (NRC-01HE)
2,4
3
1,5
1
When the TEST button is pressed and held
for at least 4 seconds, "TEST" appears on
the display, and the test run mode is
established.
(While the test run is underway, "TEST"
remains on the display.)
2
Push
button.
3
Using
button, select the operation
mode, [
COOL] or [
HEAT].
• Do not run the Air to Air Heat Exchanger with DX
Coil Unit in a mode other than [
COOL] or [
HEAT].
• The temperature controlling function does not
work during test run.
• The detection of error is performed as usual.
4
Use the [
VENT FAN] button to select "
High" or "
Low".
46-EN

Advertisement

Table of Contents
loading

Table of Contents