Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
1
Installing the Upper Handle
Parts needed for this procedure:
4
Handle bolts
4
Curved washers
4
Locknuts
Procedure
Note: Do not remove the rubber band on the cables until
you have installed the upper handle.
1. Lift and rotate the upper handle and position it over
the lower handle (Figure 3).
Important: Route the cables attached to the
Quick Stick inside the upper handle leg.
Description
Handle bolts
Curved washers
Locknuts
No parts required
Carriage bolts
Locknuts
No parts required
No parts required
No parts required
No parts required
Qty.
4
4
Install the upper handle.
4
–
Install the traction control linkage.
2
Install the chute control rod.
2
–
Fill the engine with oil.
–
Check the tire pressure.
–
Check the skids.
–
Check the operation of the traction drive.
1. Cables
2. Secure the upper handle with 4 handle bolts, 4 curved
washers, and 4 locknuts from the loose parts bag
(Figure 4).
7
Use
Figure 3