5.4 Electrical Connections:

The following electrical connections are provided on each module.
Supply: Live, Neutral and Earth. See Section 4.5 for details.
Supply Input for Boiler Fault and Normal Run Signals
Boiler General Fault Alarm Signal Output
Boiler Normal Run Signal Output
0-10v Analogue Control Signal Input
Remote on/off Control Input
Boiler Shunt Pump Output
Safety Interlock Circuit Input
Optional LPB Bus for use with Merley boiler sequencer control

6.0 PRE-COMMISSIONING

The following pre-commissioning check must be carried out before the boiler is commissioned.

6.1 Gas Supply.

Ensure that gas installation pipe work and meter has been soundness tested and purged to IGE/UP/1 or IGE/
UP/1A as appropriate. Test and purge certificates should be available for viewing.

6.2 Ventilation

Ensure that ventilation and air supply to plant room is correct.
6.3 Pipe work, Valves and Pump
Ensure that;
System flushing and suitable water treatment has been implemented
Pipe work and valve arrangement is installed to Hamworthy Heating recommendations.
Circulating system is full of water, vented and pressurised appropriately.
Circulation pump is operational.
Pipe work connections to boiler are fitted correctly.
All necessary isolation valves are open.
Condense connections on boiler and flue are connected and piped to drain.
Heat load is available.

6.4 Flue

Ensure that;
Flue system is correctly designed and installed to suit boilers.
Flue passages to chimney are clear.

6.5 Electrical

Ensure that;
Electrical connections are correct and isolatable.
External controls are operational.
WARNING: WHEN THE FRONT COVER IS REMOVED AND THE BOILER IS
OPERATIONAL, CARE MUST BE TAKEN WITH ELECTRICAL COMPONENTS AND
HAMWORTHY HEATING LTD
ACCESS TO PRIMARY INSULATION.
FLEET V series
15
500001217/D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F200vF250vF300vF350v

Table of Contents