Inspecting, Handling And Unpacking The Unit - Daikin RXYQQ8T7Y1B Installation And Operation Manual

Vrv iv system
Table of Contents

Advertisement

The installation space required on these drawings are for full
load heating operation without considering possible ice
accumulation.
If the location of the installation is in a cold climate, then all
dimensions above should be >500 mm to avoid accumulation of
ice in between the outdoor units.
INFORMATION
The service space dimensions in above figure are based
on cooling operation at 35°C ambient temperature
(standard conditions).
INFORMATION
Further specifications can be found in the technical
engineering data.
8.
Inspecting, handling and unpacking
the unit
8.1.
Inspection
At delivery, the unit must be checked and any damage must be
reported immediately to the carrier's claims agent.
8.2.
Handling
1
When handling the unit, take into account the following:
Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor
damage.
2
Choose on beforehand the path along which the unit is to be
brought in.
3
Bring the unit as close as possible to its final installation position
in its original package to prevent damage during transport.
4
2
1
4
1 Packaging material
2 Belt sling
3 Opening
4 Protector
4
Lift the unit preferably with a crane and 2 belts of at least 8 m
long as shown in the figure above.
Always use protectors to prevent belt damage and pay attention
to the position of the unit's centre of gravity.
NOTICE
Use a belt sling of ≤20 mm wide that adequately bears the
weight of the unit.
A forklift can only be used for transport as long as the unit remains on
its pallet as shown above.
Installation and operation manual
10
2
4
3
3
8.3.
Unpacking
CAUTION
To avoid injury, do not touch the air inlet or aluminium fins
of the unit.
Relief the unit from its packing material:
RXYQQ8~12
Take care not to damage the unit when removing the shrink foil with a
cutter.
WARNING
Tear apart and throw away plastic packaging bags so that
children will not play with them. Children playing with
plastic bags face danger of death by suffocation.
1
Remove the 4 bolts fixing the unit to its pallet.
2
Make
sure
that
all
"4.1. Accessories supplied with this unit" on page 4
in the unit.
8.4.
Installing the unit
Make sure the unit is installed level on a sufficiently strong base to
prevent vibration and noise.
NOTICE
When the installation height of the unit needs to be
increased, do not use stands to only support the corners.
X Not allowed
O Allowed
The height of the foundation must at least be 150 mm from the
floor.
In heavy snowfall areas, this height should be increased,
depending on the installation place and condition.
The unit must be installed on a solid longitudinal foundation
(steel beam frame or concrete) and make sure the base under
the unit is larger than the grey marked area.
RXYQQ14~20
accessories
as
mentioned
are available
RXYQQ8~20T7Y1B
VRV IV System Air Conditioner
4P345099-1 – 2013.04
in

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents