Service Space; Inspecting, Handling And Unpacking The Unit; Inspecting; Handling - Daikin VRV-W IV Installation And Operation Manual

Table of Contents

Advertisement

7.2.

Service space

When installing, provide the space mentioned below.
[1]
8
5
7
[3]
6
9
390
900
550
500
9
[4]
5
100
8
[1] Single outdoor unit installation
[2] Multi outdoor unit installation
[3] Top view
[4] Side view
5 Outdoor unit
6 Service space (front side)
7 Service space (back side)
8 Space for installing water piping
Secure enough space for removing the front panel.
9 Ventilation space above the area (
unit.
Distances are in <mm>
NOTICE
Secure spaces in the front, back and top sides in the same
way as in a single installation.
8.
Inspecting, handling and unpacking
the unit
8.1.

Inspecting

At delivery, the package should be checked and any damage should
be reported immediately to the carrier claims agent.
8.2.

Handling

When handling the unit, take into account the following:
1.
Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor damage.
2.
Choose the path along which the unit is to be brought in ahead
of time.
3.
In order to prevent any damage to the unit during installation,
use slings (cloth) or patch plates and lift the unit.
4.
Lift the unit preferably with a crane and 2 belts of at least 4 m
long.
5.
Use patch plates or clothes where the belt may hit the casing in
order to prevent the casing from being damaged.
6.
Be sure to use the standard supplied accessories and dedicated
parts as installation parts.
RWEYQ8+10T7Y1B
VRV-W IV System Air Conditioner
4P347465-1A – 2013.04
[2]
7
7
5
9
5
9
8
8
6
6
20
20
20
) of the outdoor
2
1
1 Patch plates or clothes
2 Belt sling
NOTICE
Use a belt sling with a width of 20 mm or less that can
support the weight of the product.
8.3.

Unpacking

Remove the packaging material from the unit:
Take care not to damage the unit when removing the shrink foil
with a cutter.
WARNING
Tear apart and throw away plastic packaging bags so
that children will not play with them. Children playing
with plastic bags face the danger of death by
suffocation.
1
Remove the 4 bolts fixing the unit to its pallet.
2
Make sure that all the accessories as mentioned on
available in the unit.
8.4.

Installing the unit

Make sure the area around the machine drains properly by
setting up drainage grooves around the foundation or connect
drainage equipment.
Make sure the unit is installed level on a sufficiently strong base
to prevent vibration and noise.
Secure the unit to its base using foundation bolts. (Use four
commercially available M12-type foundation bolts, nuts, and
washers.)
The foundation bolts should be inserted 20 mm.
Fix 4 foundation bolts.
Support the unit with a foundation that is larger than the hatched
area.
page 5
are
Installation and operation manual
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rweyq8t7y1bRweyq10t7y1b

Table of Contents