By-Pass Assmbly; Seconday Exchanger - Ariston Clas 24 FF Installation And Servicing Instructions

Ariston wall hung gas boilers type c
Hide thumbs Also See for Clas 24 FF:
Table of Contents

Advertisement

maintenance guide
By-pass assembly
3.12 BY-PASS ASSEMBLY
Tools
1
Drain boiler (see 3.3). Remove the
second clip and pull the assembly
Secondary heat exchanger
3.13 SECONDARY HEAT EXCHANGER
Tools
1
Drain primary and domestic hot water circuits. Remove the two
54
BY-PASS ASSEMBLY
towards you
SECONDARY HEAT EXCHANGER
screws and remove the heat exchanger
Push on the by-pass to disengage it
Time
5 min
CLAS 24/30 FF
Time
10 min

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clas 30 ffClas system 21 ffClas system 28 ff

Table of Contents