(d) Installing the ceiling panel
G
Attach the ceiling panel to the chamber. Drawing the
panel downwards sets the panel in position temporarily
with the panel catch (at 2 locations).
G
Remove the socket cover of the air-intake plenum and
pass the 8P sockets through it. (Fix the panel lead wire
with the chamber side clamp.) (Fig. 3-17)
G
Connect the 8P socket (electrical component box side)
to the 8P socket (ceiling panel side) of the indoor unit
electrical component box.
G
Reattach the socket cover.
Duct
connection
flange
Installation screws
(M4 × 1/2 in.)
Panel catch
Ceiling panel
Fig. 3-18