Jeep 1996 Grand Cherokee Service Manual page 969

Electronic service manual and supplement
Table of Contents

Advertisement

9 - 32
4.0L ENGINE
REMOVAL AND INSTALLATION (Continued)
(9) If equipped, disconnect the power steering
pump bracket. Set the pump and bracket aside. DO
NOT disconnect the hoses.
(10) Perform the Fuel System Pressure Release
procedure (refer to Group 14, Fuel System).
(11) Remove the fuel lines and vacuum advance hose.
(12) Remove the intake and engine exhaust mani-
folds from the engine cylinder head (refer to Group
11, Exhaust System and Intake Manifold for the
proper procedures).
(13) Disconnect the ignition wires and remove the
spark plugs.
(14) Disconnect the temperature sending unit wire
connector.
(15) Remove the ignition coil and bracket assembly.
(16) Remove the engine cylinder head bolts. Bolt
No.14 cannot be removed until the head is moved for-
ward (Fig. 32). Pull bolt No.14 out as far as it will go
and then suspend the bolt in this position (tape
around the bolt).
(17) Remove the engine cylinder head and gasket
(Fig. 32).
(18) If this was the first time the bolts were
removed, put a paint dab on the top of the bolt. If the
bolts have a paint dab on the top of the bolt or it
isn't known if they were used before, discard the
bolts.
(19) Stuff clean lint free shop towels into the cyl-
inder bores.
Fig. 32 Engine Cylinder Head Assembly
INSTALLATION
The engine cylinder head gasket is a composition
gasket. The gasket is to be installed DRY. DO NOT
use a gasket sealing compound on the gasket.
If the engine cylinder head is to be replaced and
the original valves used, measure the valve stem
diameter. Only standard size valves can be used with
a service replacement engine cylinder head unless
the replacement head valve stem guide bores are
reamed
to
accommodate
Remove all carbon buildup and reface the valves.
(1) Remove the shop towels from the cylinder
bores. Coat the bores with clean engine oil.
(2) Position the engine cylinder head gasket (with
the numbers facing up) onto the cylinder block.
CAUTION:
Engine cylinder head bolts should be
reused only once. Replace the head bolts if they
were used before or if they have a paint dab on the
top of the bolt.
(3) With bolt No.14 held in place (tape around
bolt), install the engine cylinder head. Remove the
tape from bolt No.14.
(4) Coat the threads of stud bolt No.11 with Loc-
tite 592 sealant, or equivalent.
(5) Tighten the engine cylinder head bolts in
sequence according to the following procedure (Fig. 33).
CAUTION:
During the final tightening sequence,
bolt No.11 will be tightened to a lower torque than
the rest of the bolts. DO NOT overtighten bolt
No.11.
(a) Tighten all bolts in sequence (1 through 14)
to 30 N·m (22 ft. lbs.) torque.
(b) Tighten all bolts in sequence (1 through 14)
to 61 N·m (45 ft. lbs.) torque.
(c) Check all bolts to verify they are set to 61
N·m (45 ft. lbs.) torque.
(d) Tighten bolts (in sequence):
• Bolts 1 through 10 to 149 N·m (110 ft. lbs.) torque.
• Bolt 11 to 13 N·m (100 ft. lbs.) torque.
• Bolts 12 through 14 to 149 N·m (110 ft. lbs.)
torque.
(e) Check all bolts in sequence to verify the cor-
rect torque.
(f) If not already done, clean and mark each bolt
with a dab of paint after tightening. Should you
encounter bolts which were painted in an earlier
service operation, replace them.
Fig. 33 Engine Cylinder Head Bolt Tightening
Sequence
ZJ
oversize
valve
stems.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

96 jeep grand cherokee2011 grand cherokee

Table of Contents