Post Adjustment And Venting - Nibe F1245 Installer Manual

Ground source
Hide thumbs Also See for F1245:
Table of Contents

Advertisement

29 Filling in the checklist
Do not forget to fill in the checklist on page 3 and in
the user manual.
30 Complete the start guide
Here you select whether to start the start guide the next
time the heat pump is restarted.
Caution
If you choose "yes" this means that the next
time the heat pump is started (e.g. after a power
cut) it will not produce heat or hot water for 60
minutes.
NIBE™ F1245

Post adjustment and venting

Pump capacity diagrams, collector side
To set the correct flow in the brine system the correct
speed must be set for the brine pump.
The flow must have a temperature difference between
brine out (BT11) and brine in (BT10) of 2 - 5 °C when the
system is balanced (suitably 5 minutes after compressor
start). Check these temperatures in menu 3.1 "service
info" and adjust the brine pump (GP2) speed until the
temperature difference is achieved. A high difference in-
dicates a low brine flow and a low difference indicates a
high brine flow.
Set the speed of the brine pump in menu 5.1.9, see page
63.
Read off what speed the brine pump should have from
the diagrams below.
Tillgängligt tryck
Eleffekt
P
F1245 5 kW
Tillgängligt tryck, kPa
120
100
80
60
40
20
0
0,00 0,05 0,10 0,15 0,20 0,25 0,30 0,35 0,40 0,45
F1245 6 kW
Tillgängligt tryck, kPa
120
100
80
60
40
30%
20
P30%
0
0,00
0,10
0,20
0,30
Chapter 6 |
Eleffekt, W
200
P100%
180
160
100%
140
P90%
120
90%
100
P70%
80
70%
P50%
60
50%
P30%
40
30%
20
Flöde
0
l/s
Eleffekt, W
200
P100%
180
160
P90%
140
100%
120
90%
P70%
100
70%
80
P50%
60
50%
40
20
Flöde
0
l/s
0,40
0,50
0,60
Commissioning and adjusting
39

Advertisement

Table of Contents
loading

Table of Contents