Unpacking And Inspection; Selecting Location; Location Recommendations; Electrical Requirements - INTERNATIONAL CARBONIC TUACA Installation And Service Manual

Table of Contents

Advertisement

This chapter covers unpacking and inspection, selecting location, installing TUACA unit and electrical
requirements.

UNPACKING AND INSPECTION

Upon receiving unit, immediately remove TUACA unit from shipping carton and inspect for shipping
damage.
NOTE:
Remove the TUACA unit from the shipping carton and inspect for shipping damage. If
shipping damage is found immediately contact Sentry BevCon at (800) 661-3003. Do not
discard the shipping carton or any shipping materials in the event a freight claim must be
filed.

SELECTING LOCATION

IMPORTANT:
LOCATION RECOMMENDATIONS FOR THE TUACA UNIT
1.
Position unit as close as possible to proper electrical source, 120V 6OHz.
2.
Position unit with a minimum of 2" space between bulkhead and cabinet for sufficient space for
ventilation. Allow enough space between ceiling and unit for vessel removal.
LOOSE - SHIPPED PARTS
Item
No.
1
2
3
4

ELECTRICAL REQUIREMENTS:

The TUACA unit must be wire in accordance with N.E.C. or local ordinance.
CHAPTER II
INSTALLATION
TUACA
Ambient temperature for cooling unit should not exceed 100 degrees
"F". Operation of cooling unit in ambient above 100 degrees "F" can
and will contribute to early failure of condensing unit and poor quality
of finished product.
Part
No.
- - - - -
Installation/Service Manual
S1842
Drain pan
12008CS
Bottle Cap w/Sleeve
18013
Strainer
Name
Qty
1
1
2
2

Advertisement

Table of Contents
loading

Table of Contents