INSTALLATION
LOCATION / VENTILATION
The welder should be located to provide an unrestrict-
ed flow of clean, cool air to the cooling air inlets and to
avoid heated air coming out of the welder recirculating
back to the cooling air inlet. Also, locate the welder so
that engine exhaust fumes are properly vented to an
outside area.

STACKING

EAGLE™ 10,000 Plus machines cannot be stacked.
CONNECTION OF K930-2 TIG MODULE TO THE
EAGLE™ 10,000 PLUS.
The TIG Module is an accessory that provides high
frequency and shielding gas control for DC GTAW
(TIG) welding. See IM528 supplied with the TIG
Module for installation instructions.
NOTE: The TIG Module does not require the use of a
high frequency bypass capacitor. However, if the
EAGLE™ 10,000 Plus is used with any other high fre-
quency equipment, the bypass capacitor must be
installed, order kit T12246.
INSTRUCTIONS

ADDITIONAL SAFETY PRECAUTIONS

Always operate the welder with the roof and case
sides in place as this provides maximum protection
from moving parts and assures proper cooling air flow.
Read and understand all Safety Precautions before
operating this machine. Always follow these and any
other safety procedures included in this manual and in
the Engine Ownerʼs Manual.