Installation
1. Place starter motor and solenoid assembly in po-
sition and install mounting bolts. Torque bolts to
50 lb. ft. (68 N·m).
2. Fasten wires as outlined in wiring diagram.
3. Coat solenoid terminal connections with Quicksil-
ver Liquid Neoprene.
4. Place rubber boot over positive battery cable con-
nection.
a - Positive Battery Cable
b - Rubber Boot
Index
4A - 18 - STARTING SYSTEM
a
b
72637
Delco PG200 and PG260
Starters
Description
The Delco PG 200 and PG260 starter motor features
small permanent magnets mounted inside the field
frame. These magnets take the place of current-car-
rying field coils mounted on iron pole pieces. Internal
gear reduction, approximately 4 to 1, through plane-
tary gears results in armature speeds in the 7000
RPM range. The armature and drive shaft are
mounted on roller or ball bearings in place of bush-
ings. The solenoid switch, plunger, return spring, and
shift lever are permanently mounted in the drive
housing.
90-816462 2-695