Download Print this page

Motor Installation - Pro-Line Boats Pro-mt Assembling Instructions

1:10 2wd monster truck kit

Advertisement

HARDWARE USED
(ACTUAL SIZE)
37
× 2
M3 × 8 SHCS
× 2
Hd Motor Washer
HARDWARE USED
Electronics Placement
(ACTUAL SIZE)
38
HARDWARE USED
Install Pre-mounted Trencher Tires
39
(ACTUAL SIZE)

Motor Installation

1.
Remove HD Transmisison Cover
2.
Install Motor
3.
Set Gear Mesh (Pinion sold separately)
4.
Reinstall Gear Cover
SPEED CONTROLLER (Not Included)
RECEIVER (Not Included)
ANTENNA TUBE
fOAM STRIPS

Advertisement

loading