Toshiba RAV-SM562BT-E Installation Manual page 16

Air conditioner split type
Hide thumbs Also See for RAV-SM562BT-E:
Table of Contents

Advertisement

4
AIR DUCTING WORK
Hanging of indoor unit
Lift up the unit with a lifter, etc., and set the hanging metal in the
hanging bolt.
• Hook nut of the hanging bolt to the groove of the hanging metal on
the main unit.
• Using the level, etc., install the main unit horizontally.
Failure to do this will cause water leakage
Mounting of filter and canvas for suction port
1. Mount a long-life filter or a high-performance filter according to each Installation Manual.
2. Mount the canvases for suction port to the lower side of the above filter.
Mounting of remote controller
For the mounting of the wired remote controller, refer to the Installation Manual attached to the remote controller.
• Take out the remote controller cord together with the refrigerant pipe or drain pipe. Be sure to set the remote
controller cord so that it passes through the upper side of the refrigerant pipe and drain pipe.
For reference
<Square duct>
(Procured locally)
Return Air side
E
18
25
J
18
A
SM562BT
Return Air side
SM802BT
(Return filter side)
SM1102, 1402BT
SM562BT
Supply Air side
SM802BT
SM1102, 1402BT
G-Ø5 mm holes
C
B
A
18
25
J
18
H
A
Model
700
1000
1350
1050
550
455 (65 x 7)
850
715 (65 x 11)
1200
1105 (65 x 17)
For supply
air side
For return
air side
18
25
25
18
B
C
D
E
400
420
700
430
420
580
420
65
530
265
65
830
265
65
1180
265
13
Washer
Hanging bolt
Supply Air side
G-Ø5 mm holes
D
A
J
J
H
A
F
G
H
I
390
4
350
195
390
8
500
195
390
8
675
195
245
20
275
132.5
245
28
425
132.5
245
40
600
132.5
Nut
Hanging bracket
18
25
25
18
J
K
350
525
227.5
130
307.5
130
552.5
130

Advertisement

Table of Contents
loading

Table of Contents