Evacuation Procedures - Hisense AS-09UR4SVNVG1 Service Manual

Split type
Table of Contents

Advertisement

4
.
R
E
F
R
I
G
E
R
A
4
.
R
E
F
R
I
G
E
R
A
4-2. Evacuation procedures:
Connect the gage manifold valve and the vacuum pump to the service port of the stop valve on the gas pipe
side of the outdoor unit.
Run the vacuum pump for more than 15 minutes and at this time confirm that the pressure gage indicates
-0.1 Mpa (-76 cmHg).
Check the vacuum with the gage manifold valve, then close the gage manifold valve, and stop the
vacuum pump.
N
T
F
L
O
W
D
I
A
G
N
T
F
L
O
W
D
I
A
G
Remove the service port cap of the stop valve on the side of the
outdoor unit gas pipe. (The stop valve will not work in its initial
Pipe length
5m and 7m maximum
No gas charge is
needed.
R
A
M
R
A
M
Pipe length
exceeding 5m and 7m
Charge the prescribed
amount of gas.
Retighten the cap.
Leak test

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

As-12ur4svgvgAs-18ur4stvvgAs-12ur4svnvg1As-24ur4sqjvg

Table of Contents