ECR International 75 Installation, Operation & Maintenance Manual page 36

Condensing gas boiler
Hide thumbs Also See for 75:
Table of Contents

Advertisement

Visual inspection of fl ame through sight glass. Burner
should be fully illuminated. See fi gure 9-5.
Check expansion tank.
11.2 Annual shut down procedure
Follow instructions "To Turn Off Gas To Appliance"
boiler is also used to supply domestic hot water. See
section 10.
Drain system completely and add antifreeze when
heating system is to remain out of service during freezing
weather.
Drain condensate lines when boiler is to be exposed to
freezing temperatures.
WARNING
!
Following service procedures must be performed
by qualifi ed service agent. Boiler owner shall not
attempt these steps.
WARNING
!
Use gloves when handling refractory to avoid
absorption of crystiline silica a potentially dangerous
compound.
11.3 Annual Examination and Cleaning of Boiler
Components
Obtain Burner Inspection Kit. See "Parts, Kits and
Optional Accessories" manual.
Before servicing, turn off electrical power to boiler at
service switch.
Follow instruction 'To Turn Off Gas to Appliance'. Close
main gas valve.
Visually inspect through sight glass verify no fl ame is
present.
11 - GENERAL MAINTENANCE AND CLEANING
11-2 Blower Inlet Assembly
unless
A
Blower Inlet Housing
B
Refractory
C
Burner
D
Flame Sensor
E
Igniter
F
Sight Glass
*
Inlet Gasket
* Not Shown
36
Burner Assembly
A
B
C
D
E
F

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

100075 97gb100 97gb

Table of Contents