Carrier A07049 Installation Instructions Manual page 21

Performance series programmable/non-programmable control ac / hp thermostat
Table of Contents

Advertisement

5. Match and connect equipment wires to proper terminals of each connector
block.
6. Push any excess wire into wall and against Equipment Control Module.
Seal hole in wall to prevent air leaks. Leaks can affect operation and cause
incorrect temperature and/or humidity measurement.
7. Remove 2- -wire pigtail from thermostat mounting base and attach to
Equipment Control Module terminal block (terminals V+ and Vg). Attach
2- -wire pigtail to the back of the Display Module via 2 pin, keyed connec-
tor.
8. Reattach Display Module body to Equipment Control Module by first
setting on at top and then push bottom corners to snap into place. See Fig.
15.
Fig. 15 - - Reattach Display Module
21
A07220

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents