Cold Weather Or Extended Storage; Power Package Lay Up; Battery Winter Storage; Power Package Recommissioning - Mercury Ski User Manual

Gasoline engines
Hide thumbs Also See for Ski:
Table of Contents

Advertisement

CA378

Cold Weather Or Extended Storage

Power Package Lay Up

IMPORTANT: MerCruiser Strongly recommends that this service should be performed by an Authorized
MerCruiser Dealer. Damage caused by freezing IS NOT covered by the MerCruiser Limited Warranty.
CA115

Battery Winter Storage

Follow battery manufacturer's instructions for storage.
CA116

Power Package Recommissioning

To prevent possible injury or damage to equipment, do not install battery until all maintenance has been
performed on engine.
1
Check that all cooling system hoses are connected properly and hose clamps are tight.
When installing battery, be sure to connect NEGATIVE (–) battery cable to NEGATIVE (–) battery terminal
and POSITIVE (+) battery cable to POSITIVE (+) battery terminal. If battery cables are reversed, electrical
system damage will result.
2
Install fully-charged battery. Clean battery cable clamps and terminals and reconnect cables (see CAUTION
listed above). Tighten each cable clamp securely when connecting.
3
Coat terminal connections with a battery terminal anti-corrosion agent.
4
Perform all checks in OPERATION CHART in the BEFORE STARTING column.
Refer to FLUSHING COOLING SYSTEM before starting engine.
5
Start engine and closely observe instrumentation to make sure that all systems are functioning correctly.
6
Carefully inspect engine for fuel, oil, fluid, water and exhaust leaks.
7
Check steering system, shift and throttle control for proper operation.
8
Check fuel pump sight tube for evidence of fuel (indicating a ruptured fuel pump diaphragm).
48
!
WARNING
!
CAUTION
!
CAUTION

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents