Replacing The Rf Pcb - KVH Industries TracVision 4 Installation & Maintenance Manual

Satellite television
Hide thumbs Also See for TracVision 4:
Table of Contents

Advertisement

Replacing a Fuse
Two 5x20 mm, 3.15-amp, 250-volt fast-blow fuses are mounted to
the main PCB (see Figure 4-3 on page 55). If one of these fuses
has blown or been broken, simply remove the bad fuse and
replace with a good fuse of the same rating.
4.5

Replacing the RF PCB

1. The RF PCB receives operating voltages from both
the main PCB and the IRD (via the RF cable).
Ensure that all power (including the IRD) is
turned off before proceeding.
2. Using a
5
" socket wrench, remove the four nuts
1 6
and washers securing the RF PCB cover (see
Figure 4-5). Set the hardware and cover aside.
RF PCB Cover
54-0150
Support Frame
RF PCB
Figure 4-5
RF PCB Mounting (Top View)
Maintenance
57

Advertisement

Table of Contents
loading

Table of Contents