2001 F-150 Workshop Manual
7. Connect the heater hose.
8. Install the generator. For additional information, refer to
9. Install and connect eight ignition coils. For additional information, refer to
10. Connect the eight fuel injector electrical connectors.
11. Install the power steering reservoir.
Position the reservoir.
Install the two lower bolts.
Install the upper bolt.
12. Install the PCV hose.
http://www.fordtechservice.dealerconnection.com/pubs/content/~WS11/~MUS~LEN/19/S...
Section
414-02.
Section
303-07B.
Page 8 of 12
5/29/2010