Rinnai REU‐VC2528FFUD‐US Installation And Operation Manual page 14

Direct vent tankless water heater
Table of Contents

Advertisement

Flue Installa on (indoor models only)  
Install the ven ng termina on according to the diagrams and instruc ons below. 
WARNING
If the condensate collector is not used, the drain pipe 
must be capped to prevent exhaust gases and 
condensate from entering the building.  The cap is 
supplied on the appliance. 
Horizontal Termina on using the 
Condensate Collector 
Condensate 
Trap 
Condensate Collector 
14 
Horizontal Termina on without using the Condensate Collector 
3 in (75 mm) 
minimum 
Securing Screw 
* The condensate collector must be used in 
horizontal termina ons if a ver cal rise in 
the vent system exceeds 5 . 
Maximum Height * 
5 feet (1.52 m) 
(condensate collector must be used in all installa ons) 
3 in (75 mm) 
minimum 
To adjust the condensate collector posi on or to 
replace the female vent top with a male vent top: 
Bracket 
1.  Loosen the 4 screws at the rear bracket  
2.  Slide the bracket away from the female vent top. 
3.  Remove the 4 screws a aching the female vent top 
to the water heater. 
4.  Li  up the female vent top and reposi on as desired 
(or replace with a male vent top). 
5.  Install the 4 screws at the vent top and  ghten the 4 
screws at the bracket. 
Secure the first vent component to the water heater 
with one self‐tapping screw at the hole located above 
the condensate collector. 
VC Series Manual 
Regions of cold climate will create more 
condensate in the vent system.  The 
condensate collector should be used in 
cold climates. 
If more than one elbow is used in the 
ver cal sec on the condensate collector 
must be used. 
Ver cal Termina on  
3 in (75 mm) 
minimum 

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents