Fujitsu Primergy CX400 S2 Operating Manual page 17

Server enclosure
Table of Contents

Advertisement

Mounting order
Figure 1: Mounting order
Item
Bay
1
Installation bay 1 for server node CX250 S2
2
Installation bay 2 for server node CX250 S2 or CX270 S2
3
Installation bay 3 for server node CX250 S2
4
Installation bay 4 for server node CX250 S2 or CX270 S2
5
Installation bay 1 for PSU
6
Installation bay 2 for PSU
Table 1: Mounting order of server nodes
Each CX400 S2 has to be populated with 1 up to 4 CX250 S2 server nodes or
with 1 up to 2 CX270 S2 server nodes.
All nodes are hot pluggable, and all nodes are of the same type. Each node has
to have the identical configuration. Dummy modules are installed for proper
airflow if some server nodes are not populated.
For the minimum configuration one PSU has to be installed.
CX400 S2
Operating Manual
Functional overview
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents