Installation Tip; Installation Of The Clr2160; Installation Of The Clrco2175 - U-Line CLR2160 Installation Manual

Echelon series clear ice maker combo clear ice maker/refrigerator
Hide thumbs Also See for CLR2160:
Table of Contents

Advertisement

2. If the ice maker is not level, adjust the feet on the
corners of the unit as necessary (see Figure 50).
Figure 50
3. Check the levelness after each adjustment and repeat
the previous steps until the unit is level. Go on to
9 Install the Unit.

Installation Tip

If the room floor is higher than the floor in the cut-out
opening, adjust the rear feet to achieve a total unit rear
height of 1/8" less than the opening's rear height. Shorten
the unit height in the front by adjusting the front feet.
This allows the unit to be gently tipped into the opening.
Readjust the front feet to level the unit after it is correctly
positioned in the opening.
05/2007
CLR2160/CLRCO2175 Ice Makers
Turn Foot to Adjust
9 Install the Unit

Installation of the CLR2160

1. Open the water supply valve in the main water source.
2. Plug in the power cord.
3. Open the door and press the POWER icon (see Figure
53, 1) (Page 23) on the display panel until OFF is
displayed.
Note: If the unit is NOT turned OFF, water will
immediately start flowing into the unit when it is first
plugged into the electrical outlet.
4. Gently push the unit into position. Be careful not to
kink the drain or water supply line or entangle the
electrical cord.
5. Re-check the leveling, from front to back and side to
side. Make any necessary adjustments. The unit's top
surface should be approximately 1/8" below the
countertop.
Test the drain system by pouring one gallon of water into
the ice bin. The water should drain freely and there should
be no leakage.

Installation of the CLRCO2175

1. Open the water supply valve in the main water source.
2. Plug in the power cord.
3. Open the door and press the POWER icon (see Figure
53, 1) (Page 23) on the display until OFF is displayed.
Note: If the unit is NOT turned OFF, water will
immediately start flowing into the unit when it is first
plugged into the electrical outlet.
4. Gently push the unit into position. Be careful not to
kink the drain or water supply line or entangle the
electrical cord.
5. Re-check the leveling, from front to back and side to
side. Make any necessary adjustments. The unit's top
surface should be approximately 1/8" below the
countertop.
6. Test the drain system by pouring one gallon of water
into the ice bin. The water should drain freely and there
should be no leakage.
7. Remove the tape from the glass shelves and wipe out
the inside of the unit with a clean, water-dampened
cloth.
21
www.U-LineService.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clrco2175

Table of Contents