Shutdown And Cleaning; Pail Flushing - Magnum 262800 Operation

Airless sprayer
Hide thumbs Also See for 262800:
Table of Contents

Advertisement

Shutdown and Cleaning

Pail Flushing

For short term shutdown periods (overnight to
two days) refer to Short Term Storage, page 22.
For flushing after spraying oil-based coatings,
use compatible oil-based flushing fluid or min-
eral spirits. Read Priming and Flushing Storage
Fluid, page 11.
For flushing after spraying water-based coat-
ings, use water. Read Priming and Flushing
Storage Fluid, page 11 or Power Flush, page
19.
1. Relieve pressure, page 10.
2. Remove tip and guard assembly from gun and
place in flushing fluid.
3. Lift suction tube and prime tube from paint pail.
Let them drain into paint pail for a while.
4. Separate prime tube (smaller)
from suction tube (larger).
5. Place empty waste and
water or solvent pails
side by side.
312001R
6. Place prime tube in waste
pail.
7. Submerge suction tube in
water or flushing solvent.
8. Turn pressure control knob to
the Prime/Clean setting.
9. Turn power switch ON.
10. Flush until approximately 1/3 of the flushing
ti2039a
fluid is emptied from the pail.
11. Turn power switch OFF.
ti9726a
Shutdown and Cleaning
ti9652a
ti9651a
ti9344a
ti5580a
ti2018a
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

262805261815261820X5X7Prox7 ... Show all

Table of Contents