Subtest 8 Docker Dock/Undock; Subtest 9 Fan Control; Subtest A E2Prom (Mac/Guid) - Toshiba PORTÉGÉ M700 Maintenance Manual

Hide thumbs Also See for PORTÉGÉ M700:
Table of Contents

Advertisement

3 Tests and Diagnostics
Subtest 8
Docker Dock/Undock
This subtest is executed with an Slim Port Replicator II. installed.
Press Enter while pushing the eject button of the Slim Port Replicator II. the
following message appears.
Pushing Eject-SW, and press [Enter] Key
Press Enter without pushing the eject button of the Slim Port Replicator II.
after the following message appears.
Release Eject-SW, and press [Enter] Key
If the test ends successfully, the display returns to the ONLY ONE TEST menu.
When the display returns to the ONLY ONE TEST menu, remove the Express
Port Replicator from the computer.
Subtest 9
Fan control
This subtest checks if FAN works properly.
The following message appears in the display in order.
! Start low-speed rotation..........Waits 8 seconds
! Start reading of rotation............Waits 3 seconds
! Start Hight-speed rotation........Waits 8 seconds
! Start reading of rotation............Waits 3 seconds
FAN Low-speed----> Target Low: 3900 Rpm Result Low: XXXX Rpm OK!
FAN High-speed---> Target High: 5400 Rpm Result High: XXXX Rpm OK!
OK message appears in the display if the test ends without a defective.
NG message appears in the display if a defective is found during the test.
Subtest A
E2PROM (MAC/GUID)
It checks whether the MAC address, GUID of IEEE1394 information are
written.
3-52
[CONFIDENTIAL] PORTEGE M700/M750 Maintenance Manual (960-661)
Rev B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Portégé m750M750 - portege - core 2 duo 2.53 ghz

Table of Contents