Ce Marking; This Manual - Ariston NUOS FS 200 Instructions For Installation And Servicing

External air source heat pump water heater
Table of Contents

Advertisement

1.4 CE M
ARKING
1.5 T
M
HIS
ANUAL
The CE marking applied to the appliance certifies that it conforms to the
essential requirements of the following European Directives:-
2006/95/EC concerning the safety of electrical equipment.
2004/108/EC concerning electromagnetic compatibility.
Checks are carried out in conformity with the following technical standards:-
EN 255-3; EN 60335-1; EN 60335-2-21; EN 60335-2-40;
EN 55014-1; EN 61000-3-2; EN 61000-3-3; EN 50366.
The manufacturer's ability to manufacture and supply all products in
conformity with the above mentioned regulations is guaranteed by a
company quality management system that is certified according to the
ISO 9001 2008 standard.
This NUOS manual is intended for:-
1.
The installer
2.
The end user.
The manual is an integral and essential part of the product. It should be
kept with the appliance so that it can be consulted by the user and/or
authorised personnel.
To ensure that the appliance is installed and used properly and safely,
both the installers and user must carefully read the instructions and
precautions contained in this manual as they provide important information
for both their areas of competence, regarding safety, installation, use and
maintenance of the appliance.
This manual is divided into sections.
Section 1 General Information
This section is intended for both installers and users of the NUOS. It
contains general information for the appliance, layout and description
plus important information about the manual.
Section 2 Safety
Section 3 User Instructions
The Installer, once the system is operating correctly, should
demonstrate the NUOS operation with the aid of this section.
Section 4 Installer's Settings
Installer's control parameter settings.
Section 5 Technical Data
Generally intended for the specifier and installers including technical
data, dimensions and special requirements.
Section 6 Installation
Includes information for the installing Plumbing Engineer and
Electrician.
Section 7 Commissioning System
Essential information for the installer for the completion of the NUOS
installation.
Section 8 Maintenance
Includes maintenance and fault finding.
Section 9 Benchmark Logbook
5 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents