Preparations Before Start; Performing A Run - GE EPS 3501 XL Operating Instructions Manual

Electrophoresis power supply
Hide thumbs Also See for EPS 3501 XL:
Table of Contents

Advertisement

4.4 Preparations before start

Connect the leads from the electrophoresis unit (red to red, and black or blue to blue).
Red is positive and black or blue negative. Up to two electrophoresis units can run at the
same voltage at one time. Remember to double the maximum current and power
conditions if two units are to be run. Voltage will be the same regardless of the number
of units. The current should also be doubled if two gels are run on the same unit.

4.5 Performing a run

Running a program is described schematically in Figure 4-5.
Choosing a program
Press set enter and select the program you wish to run by pressing
is correct. (Omit this step if you have just programmed or edited a method as described
in Programming a method‚ on page 28 and Editing a program‚ on page 33.)
Running
Press run to start the electrophoresis. Information about the status of the start current
check will be displayed for a few seconds. The display will then show current values for
voltage, current and power and one of elapsed time, volthours or milliamperehours. You
can switch between showing the elapsed time, volthours or milliamperehours by
The parameter controlling the electrophoresis is underlined.
A light emitting diode shows when voltage is applied (HV on).
If no current is displayed or if "HALT: Low start current" is shown, check the electrical
connections to the electrophoresis equipment.
Electrophoresis Power Supply EPS 3501 XL Operating Instructions 28-9639-69 AA
Operation 4
Preparations before start 4.4
until the value
.
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents