The ES45T-R-1 reflector is composed of six precision-formed panels designed for accu-
Reflector
racy and strength and ensure reliable surface contour which provides exceptional oper-
ating characteristics in C- or Ku-frequency band.
Step 1
Reflector should be assembled on a clear, flat area in front of the foundation pad. Clear
debris from area and place plastic sheeting from packing crate as shown in Figure 22.
Step 2
Arrange the six diameter setting bands (P/N 49426) and temporary supports as shown
in Figure 20.
Note: Proper orientation of reflector (top, bottom) will ease reflector assembly
Tighten ¼-20 hardware at connection of bands to a snug fit
Reflector should be assembled in front of foundation pad with bottom of reflector 3 ft.
from pad
Supports should be 6-8 in. high
Tie three string levels to opposing sets of blocks across diameter of circle
Adjust supports with shims until strings are level and lightly touch at center of circle
Once supports are level, remove strings
Move supports 12 in. radially away from circle, carefully maintaining orientation and
height for later reuse
ES45T-R Reflector Assembly
22
Figure 20
Installation Procedures