Andrew ES45T Installation, Operation And Maintenance Manual page 19

Andrew installation, operation and maintenance 4.5-meter earth station antenna es45t
Table of Contents

Advertisement

Step 13
Determine required length of elevation strut to nearest degree increment of desired ele-
vation setting as specified in the Elevation and Azimuth Adjustments Section. Adjust
coarse setting by extending secondary and, if necessary, tertiary sections to length.
Install eight ½ in. set screws and securely tighten as pictured in Figure 15.
CAUTION: Do not extend secondary or tertiary struts into red warning areas.
Figure 14
Figure 15
19
Installation Procedures

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents