1
2
3
1. Main Terminal Block
2. Bonding Lug/Grounding Terminal
3. Power wires Entrance (Electrical fitting and conduit must be
installed)
(north american 240 VaC Connection shown)
L2
L1
*
Power In
*
Electrical fitting and conduit must be installed
Figure b
60hz terminal block Connection
L1
L2
Figure C
Terminal Connection
Main
Terminal
Block
L2
L1
BLK
Green
*
Power In
Use screwdriver
to pry open
the connector
Insert power
wires and
secure connection
Grounding
Lug
RED
J-400
Main
Terminal
Block
L1
L2
BLK
RED
Green
*
Power In
Page 13