SECTION 2: INSTALLATION/OPERATION INSTRUCTIONS
All items found within the dotted region are found
within the footprint of the machine.
MANUAL
SHUTOFF
VALVE
BUILDING
STEAM
SUPPLY
BUILDING
STEAM
RETURN
BUILDING
WATER
SUPPLY
WATER TREATMENT
CARTRIDGE (IF
INSTALLED)
BUILDING
STEAM
SUPPLY
BUILDING
STEAM
RETURN
300XS SYSTEM FLOW DIAGRAM
STEAM
SOLENOID
VALVE
S
Y-STRAINER
STEAM
TRAP
EXTERNAL STEAM BOOSTER
300X Series Technical Manual 7610-002-64-22
Issued: 07-26-2006 Revised: N/A
12
STEAM COILS
PRESSURE
REGULATING
VALVE
Y-STRAINER
Steam plumbing should be assembled and connected
to the steam booster in accordance with the steam
booster manufacturer's instructions and applicable
codes.
VACUUM
BREAKER
PRESSURE
GAUGE
RINSE
S
SOLENOID
VALVE