Heater Assembly - Jackson AJ-100 Technical Manual

Conveyor series
Table of Contents

Advertisement

5/16" Lockwasher
05311-275-01-00
Model
Volts
All*
208
230
208
230
460
Model
KW
All*
15
* - "CS" & "CGP" models do not use electric heaters in the wash tank or power rinse tank.
SERVICE NOTE: When replacing the tub heaters, it is HIGHLY recommended that you also change out the gasket as well.
Once installed, gaskets become compressed and are subjected to extreme temperature changes. Replacing the gasket with a
new one when replacing the heater may prevent future leaks.
SERVICE NOTE: The nuts used to secure the heater to the tub should be torqued to 16 in-lbs. After tightening, the unit should
be allowed to heat up and operate normally for approximately 30 minutes. Secure power to the machine and check the nuts
once more to ensure that they are torqued to 16 in-lbs.
SECTION 5: PARTS SECTION

HEATER ASSEMBLY

See Heater Chart Below
Heater Chart
Phase
KW
Part Number
1
10
06401-003-12-94
1
10
06401-003-12-95
3
10
06401-003-12-94
3
10
06401-003-12-95
3
10
06401-003-12-96
Heater Chart
208V Models
04540-121-68-45
AJ-64 Conveyor Series Technical Manual 7610-003-30-93
Issued: 05-02-2006 Revised: N/A
60
Heater Gasket
05330-011-47-79
5/16"-18 Hex Nut
05310-275-01-00
230V Models
460V Models
04540-121-68-46
04540-121-68-47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aj-64

Table of Contents