Notes For The Installer; Transport Struts; Setting Up The Machine - Miele MM 50-175 Operating Instructions Manual

Table of Contents

Advertisement

The rotary ironer may only be
commissioned by a Miele service
technician or Miele authorised Service
Dealer.
This machine must not be operated in the
same room as dry cleaning machines which
use solvents containing perchlorethylene
(PER) or chlorofluorocarbons (CFCs). On
combustion, the escaping vapours are
decomposed to form hydrochloric acid
which can have dangerous consequences.

Transport struts

Parts 1 to 5 are wooden struts, screwed in
position to protect the machine during
transportation. They must not be removed
until the machine has been moved to the site
where it will be installed.
,
The machine must not be moved
without the transit struts in place.
Store the transit struts in a safe place for
future use. They must be re-fitted if the
machine is to be moved again (e.g. when
moving location).
M.-Nr. 05 567 240 /03

Notes for the installer

Setting up the machine

The machine must be transported to its
installation site with the transport struts in
position. Maintain the safety distances from
walls as specified on the installation
diagram. Dismantle the sides from both side
stands and remove the screws from the
wooden frame.
To lift the machine use the square pipe
supplied (see illustration). Slide the square
pipe into the holder in the side stand and lift.
If necessary place planks of wood under the
stands as a safety precaution when lifting
the machine. Do not lift the ironer any higher
than is necessary.
,
Do not reach underneath the machine.
Danger of injury.
Pull the wooden frame away from under the
machine.
Remove the planks from under the stands
very carefully one by one.
Using the installation diagram supplied drill
holes for the plugs (supplied in the
accessory pack) into the floor at the correct
distance from the wall. Insert the plugs.
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents