Performance Checklist - Viking VCFB5301 Installation Manual

30” all refrigerator/all freezer
Hide thumbs Also See for VCFB5301:
Table of Contents

Advertisement

26
Press "ACTIVATE CONTROLS" button pad and close
door.
Note: There is a 6 minute delay before the unit starts.
42

Performance Checklist

h Align/square door(s).
h Verify cabinet size.
h Verify drain pan is properly installed and
h Verify electrical supply and water supply
(if applicable).
h Install anti-tip device(s) and verify unit is
h Install kickplate.
secure.
h Remove internal packaging and labels
h Position unit in cutout, level at desired
height, and secure unit.
Installer's information:
h Plug-in unit and verify operation.
h Connect water supply (if applicable).
Installer's name:
• Verify icemaker fill tube is properly
inserted.
Installer's company:
• Verify icemaker bailarm is down.
• Verify dispenser operation
Date: ________________________________________
(if applicable).
43
there are no leaks in water connection.
and wipe unit down.
_____________________________
_________________________

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vcrb5301Vcfb5361Vcrb5361

Table of Contents