Zanussi ZHC 95 ALU Instruction Booklet page 18

Cooker hood
Hide thumbs Also See for ZHC 95 ALU:
Table of Contents

Advertisement

Ducting or re-circulation fitting
Ducting fitting.
This is possible for all forms of installation:
a) Connect the air outlet to the external ducting system.
b) Remove the activated charcoal filter (if there is one)inside the hood canopy
(see Maintenance).
Re-circulation fitting
This is only possible with the air outlet directed upwards. Fit the venting grille G
onto the air outlet.The activated charcoal filter should be fitted inside the hood
canopy after connection to the power supply.
Connection to power supply and checking of good working
order
1 - It is absolutely necessary to follow the warnings 3.2,3.3 and 3.4 of paragraph 3,
concerning safety measures.
2 - Loosen the two locking screws and remove the metal cover.
Connect the hood connection to the engine connection (a).Correctly place the
connectors under the cover and tighten the two locking screws (b).
3 - Once electrical connection has been carried out, check that lights, engine and
change of speed work.
4 - Fit the lower grill and the activated carbon filter (only for filter mode)(see Maintenance).
INSTALLATION INSTRUCTIONS
S36_26
a
b
18
G
S36_27

Advertisement

Table of Contents
loading

Table of Contents