Lincoln 1100 Series Service Manual page 48

1100 series impinger conveyor ovens
Table of Contents

Advertisement

TO REVERSE CONVEYOR DIRECTION ON STEPPER DRIVE SYSTEM
1. Shut off power at main breaker.
2. Remove conveyor.
3. Remove front control box cover.
4. Change position of dip switch #1 on stepper control board as described on page 46.
5. Reassemble in reverse order.
TRANSFORMER - STEPPER MOTOR CONTROL
1. Shut off power at main breaker.
2. Remove conveyor.
3. Remove front cover.
4. Disconnect transformer wire harness.
5. Remove two (2) mounting screws.
6. Reassemble in reverse order.
HALL EFFECT SENSOR - REPLACEMENT
Remove two (2) mounting screws and remove sensor from conveyor motor. Reinstall in
reverse order.
TYPE OF GAS
INCHES of
WATER
COLUMN
NATURAL GAS
L..P. GAS
CITY/TOWN GAS
AIR PRESSURE SWITCH, BURNER OR OVEN CAVITY
TO REPLACE AIR SWITCH:
1. Shut off power at main breaker.
2. Remove conveyor.
3. Remove rear control compartment cover.
4. Remove cover of air switch exposing adjustment screw.
5. Disconnect and mark wires for proper reassembly.
6. Remove air tube and remove switch from hanger.
7. Reinstall in reverse order, making sure wires are properly attached and air tube is properly attached,
unblocked and aligned properly to avoid crimping.
TO CALIBRATE AIR SWITCH:
1. If switch will not activate when blower pressure is supplied, turn adjustment screw counter clockwise (-).
2. If switch will not deactivate when blower pressure is eliminated, turn adjustment clockwise (+).
48
CENTIMETERS of
WATER COLUMN
3.5" WC
8.9 cm WC
10"WC
25.4 cm WC
1.4"WC
3.56 cm WC
kPa
Mbar
.87kPa
8.70Mbar
2.48kPa
24.8Mbar
.35kPa
3.5Mbar
Impinger II –1100 Series Service Manual - Domestic

Advertisement

Table of Contents
loading

Table of Contents