Chapter 1 Getting Started; Preinstallation Requirements; 1.1.1 Selecting A Site; 1.1.2 Checking The Package Contents - Acer Altos 21000 Series User Manual

Table of Contents

Advertisement

Chapter 1
This chapter tells how to install and set up the system. It gives instructions on
how to select a site for the system, prepare the system for use, connect basic
peripherals, and start up the system.
1.1

Preinstallation Requirements

1.1.1 Selecting a Site

Before unpacking and installing the system, select a suitable site for the system for
maximum efficiency. The system is suitable to set up in an office environment.
Consider the following factors when choosing a site for the system:
Near a grounded power outlet
Clean and dust-free
Sturdy surface free from vibration
Well-ventilated and away from sources of heat
Secluded from electromagnetic fields produced by electrical devices such as
air conditioners, radio and TV transmitters, etc.

1.1.2 Checking the Package Contents

The System Contents sheet, located inside the box, lists what is included with the
system.
If any of the items are damaged or missing, contact your dealer
immediately.
Save the boxes and packing materials for future use.
Getting Started
Chapter 1 - Getting Started
1-1

Advertisement

Table of Contents
loading

Table of Contents