• Creation of users, roles and security groups
• Configure role based start centers
• Creation of Job plans, work orders
– Configuration of the tool to map to business processes which includes, but
is not limited to:
• Addition or deletion (as the case may be) of fields on screen and
• Create communication templates
• Create escalation points and define SLAs in the system
• Create and test data migration scripts
• Migrate data from its existing source to Maximo
• Build integration interfaces - either using custom code or MEA (as the
• Creation and deployment of reports
Phase 4: Testing and Go-Live
Role Involved: Project Manager, Solution Architect, Testers, Maximo Developers
Optional Roles: DBA, Application Server Specialist
Key Activities:
Testing
The first key task is migration from development environment to test
environment. Depending on the customer's environment and the complexity of
implementation, customer may decide to use automated tools for testing or a
manual approach, nevertheless all or some of the following types of testing
needs to be carried out:
– Functional Testing
• Test validations in new fields
• Test emails being sent on escalations
• Test accuracy of data flowing between modules in the system
• Test data accuracy in reports
– System Integration Testing
• Test accuracy of data coming from external systems
• Test accuracy of data going into external systems
• Scenario testing to ensure there is nothing that affects availability of
– Performance Testing
• Page Load time
• Peak load
24
Maximo Essentials V7.1 - Implementer's Guide
database
case may be)
any system
Draft Document for Review May 23, 2008 10:14 am

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Maximo asset management essentials v7.1

Table of Contents