Installation Below a
Monogram Advantium Oven
21"
23"
45-1/4"
NOTE: The middle rail separating the two openings
may need to be larger than the 2" minimum shown.
Always refer to the individual installation instructions
packed with each product for specific requirements.
Combined Advantium and Wall Oven
Installation:
When installed in combination with a Monogram single
wall oven, use separate electrical junction boxes,
OR,
Install a single junction box connected to 50 amp supply
circuit or properly rated supply circuit.
• Refer to the Advantium oven installation instructions
for electrical requirements of that product.
• These connections must be made by a qualified
electrician. All electrical connections must meet
National Electrical code or prevailing local codes.
Warming Drawer Combined with Advantium
and Single Oven:
Install a separate 120V, 60Hz, properly grounded
receptacle. See installation Instructions packed with
the Warming Drawer.
Cabinetry
23-1/2" Min.
Inside
2" Min.
Note: Install the
oven only with
28-1/2"
specific models
listed on the label
located on top of
the oven.
Installation Between a
Monogram Advantium Oven and
a Warming Drawer
21"
23"
45-1/4"
9-1/4"
NOTE: Additional clearances may be required.
Check to be sure the oven supports above the
Warming Drawer does not obstruct the required
interior 23-1/2" depth and 9-1/4" height. The middle rail
separating the openings may need to be larger than
the 2" minimum shown. Always refer to the individual
installation instructions packed with each product for
specific requirements.
6
23-1/2" Min.
Inside
2" Min.
2" Min.
28-1/2"
1" Min.
Above
Toekick