PremierLinkt (Factory- -Option) —
The PremierLink controller (see Fig. 27) is compatible
with Carrier Comfort Networkr (CCN) devices. This
control is designed to allow users the access and ability to
change factory- - defined settings, thus expanding the
function of the standard unit control board. CCN service
access tools include System Pilot (TM), Touch Pilot (TM)
and Service Tool. (Standard tier display tools Navigatort
and Scrolling Marquee are not suitable for use with latest
PremierLink controller (Version 2.x).)
The PremierLink control is factory- - mounted in the
50TCQD unit's main control box to the right of the
Control Terminal Board (CTB). Factory wiring is
completed through harnesses connected to the CTB
thermostat. Field connections are made at a 16- - pole
terminal block (TB1) located on the bottom shelf of the
unit control box in front of the PremierLink controller.
The factory- - installed PremierLink control includes the
supply- - air temperature (SAT) sensor. The outdoor air
temperature
(OAT)
sensor
FIOP/accessory EconoMi$ert2 package.
The PremierLink controller requires the use of a Carrier
electronic thermostat or a CCN connection for time
broadcast to initiate its internal timeclock. This is
necessary for broadcast of time of day functions
(occupied/unoccupied).
NOTE:
PremierLink controller is shipped in Sensor
mode. To be used with a thermostat, the PremierLink
controller must be configured to Thermostat mode. Refer
to PremierLink Configuration instructions for Operating
Mode.
Supply
Air
Temperature
FIOP- - equipped 50TCQD unit, the unit is supplied with a
supply- - air temperature (SAT) sensor (33ZCSENSAT).
This sensor is a tubular probe type, approx 6- - inches
(12.7 mm) in length. It is a nominal 10- - k ohm thermistor.
Fig. 27 - - PremierLink Controller
is
included
in
the
(SAT)
Sensor
On
The SAT is factory- - wired. The SAT probe is mounted in
the fan deck (see Fig. 28). It can ce removed or remounted
per local codes.. Drill or punch a 1/2- - in. hole in the flange
or duct. Use two field- - supplied, self- - drilling screws to
secure the sensor probe in a horizontal orientation. Insure
that the sensor wires do not contact the hot surface of the
electric heaters.
SUPPLY AIR
TEMPERATURE
SENSOR
SUPPLY AIR
Fig. 28 - - Mounting Location for Supply Air
Temperature (SAT) Sensor on 50TCQD Units
NOTE:
Refer to Form 33CS- - 58SI for complete
PremierLink configuration, operating sequences and
troubleshooting information. Have a copy of this manual
available at unit start- - up.
NOTE: The sensor must be mounted in the discharge
airstream downstream of the cooling coil and any heating
devices. Be sure the probe tip does not come in contact
with any of the unit's heater surfaces.