PRE-INSTALLATION PREPARATION
The.gas.supply.line.may.be.connected.through.
side.framing.or.alternately.through.lower.sub-
flooring or a platform base if provided (see
Figures 10 and 11). Depending on installation,
refer.to.appropriate.illustrations.
Figure 9 - Rough Opening for Installing
See-Thru Fireplace
2" Dia. Hole
Figure 10 - Hole Locations For Gas Line
and Electric Wires for Peninsula and
See-Thru Fireplaces
8
Continued
39
/
"
3
4
Min.
1" Dia. Hole
3"
3"
www.desatech.com
Figure 11 - Alternate Gas Supply
Location
10"
Square Min.
Height
Depends On
Installation
Figure 12 - Rough Opening for Installing
Exterior Vent Terminal
o
90
Elbow
45
o
Elbow
Vertical
Height
Depends on
Installation
26
3
Horizontal
Length Depends
on Installation
Figure 13 - Vent Opening Height
/
"