Advertisement

PrimeTest 50

Operating Instructions

Operating Instructions

Advertisement

Table of Contents
loading

Summary of Contents for Seaward PrimeTest 50

  • Page 1: Operating Instructions

    PrimeTest 50 Operating Instructions Operating Instructions...
  • Page 2 SEAWARD Electronic Limited reserves the right to alter the equipment specification and description outlined in this publication without prior notice and no part of this publication shall be deemed to be part of any contract for the equipment unless specifically...
  • Page 3 EMC and Safety Standards. The product identified above conforms to the requirements of Council Directive 89/336/EEC and 73/23 EEC. Seaward Electronic Ltd is registered under BS EN ISO9001:2000 Certificate No: Q05356.
  • Page 4: Table Of Contents

    PrimeTest 50 Operating Instructions Contents Important Information Introduction Performing Tests Checking a mains power outlet Testing a Class I Appliance Testing a Class II Appliance Testing a mains cord Specification Maintenance Battery Check Battery Replacement Service and Calibration...
  • Page 5: Important Information

    These operating instructions are intended for the use of adequately trained personnel. The following symbols are used in these operating instructions and on the PrimeTest 50. Caution, risk of electric shock. Indicates instructions must be followed to avoid danger to persons.
  • Page 6 PrimeTest 50 Operating Instructions Figure 1. PrimeTest 50 Front View Figure 2. PrimeTest 50 End View...
  • Page 7: Introduction

    PrimeTest 50 Operating Instructions 2 Introduction The PrimeTest 50 is a hand held battery powered unit suitable for carrying out electrical safety checks • Class I appliances • Class II appliances • IEC mains leads • Extension leads • Mains outlet wiring Numbers shown in circles e.g.
  • Page 8: Performing Tests

    PrimeTest 50. When the unit is ready the display will be as shown below. Checking a mains power outlet Connect the IEC power cord to the PrimeTest 50 socket and plug into the mains power outlet to be tested.
  • Page 9: Testing A Class I Appliance

    PrimeTest 50 Operating Instructions In the event of a failure, disconnect the PrimeTest 50 from the supply and rectify the fault. Do not leave the PrimeTest 50 permanently connected to a mains supply. The auto switch-off function is disabled when the PrimeTest 50 is connected to a live mains socket.
  • Page 10 • If the Check Connections enunciator remains on the display, the load presented by the appliance may be too small for the PrimeTest 50 to detect. In this case, press the test key continue. • If the Insulation Resistance is greater than the...
  • Page 11: Testing A Class Ii Appliance

    • Plug the earth test lead into the 4mm socket on the PrimeTest 50 end panel. • Plug the appliance into the PrimeTest 50 front panel mains socket • Connect the earth test probe to an exposed metal part on the appliance.
  • Page 12: Testing A Mains Cord

    • If the Check Connections enunciator remains on the display, the load presented by the appliance may be too small for the PrimeTest 50 to detect. In this case, press the test key continue. • If the Insulation Resistance is greater than the...
  • Page 13 PrimeTest 50 Operating Instructions • If the Insulation Resistance is lower than the acceptable limit a cross is placed next to the Insulation enunciator and the test sequence is halted. • If the Insulation Resistance is greater than the acceptable limit a tick is placed next to the Insulation enunciator.
  • Page 14: Specification

    Cord Test Earth continuity, insulation resistance as above. Check for Live and Neutral open circuit, short circuit or reversed polarity. When used with Seaward test lead, Part Number 347A002 Environmental rating IP40 Operating temperature range 0°C to 40°C, without moisture condensation.
  • Page 15: Battery Check

    PrimeTest 50 Operating Instructions 6 Battery Check The PrimeTest 50 is powered from a 6 AA cells which are checked before a test is performed. When the battery voltage is low the Low Batt enunciator is illuminated. The unit will continue to perform within specification for a limited number of tests, dependent upon the type of the batteries fitted.
  • Page 16: Service And Calibration

    PrimeTest 50 Operating Instructions 7 Service and Calibration maintain specified accuracy measurement results, the instrument must be recalibrated at regular intervals by either the manufacturer or an authorised Seaward Service Agent. We recommend a recalibration period of one year.
  • Page 17 Thank you for reading this data sheet. For pricing or for further information, please contact us at our UK Office, using the details below. UK Office Keison Products, P.O. Box 2124, Chelmsford, Essex, CM1 3UP, England. Tel: +44 (0)1245 600560 Fax: +44 (0)1245 808399 Email: sales@keison.co.uk...

Table of Contents