Commissioning - Mira Sport Thermostatic 9.0 Installation & User Manual

Electric shower
Table of Contents

Advertisement

Before carrying out the commissioning procedure install the Shower Fittings,
refer to the Shower Fittings Installation and User Guide.
If you are unsure how an electric shower works, please read through the User
Instructions section before continuing.
1.
Electrical supply is turned
off at the mains.
4.
Check for water leaks.
7.
Push START button. Light
on the button comes on.
10.
5 - 10 secs
The temperature will rise
slightly.

COMMISSIONING

2.
Turn control to full cold.
5.
Set control to LOW.
8.
0 - 15 secs
Water will be flowing at a
cool temperature.
+
_
14
3.
Turn water supply fully
on.
6.
S w i t c h o n e l e c t r i c a l
supply.
9.
Set control to MEDIUM.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sport thermostatic 9.8

Table of Contents