Reinstall All Panels - Bosch GreenSource SM024 Installation And Maintenance Manual

Table of Contents

Advertisement

24 | Vertical configurability
Figure # 84
6. Reconnect all the wiring disconnected in Step
#1.
Ensure all connectors are properly oriented
and are fully engaged.
7. Identify and re-route LCD wiring harness to the
new location.
Panel containing LCD always mounts on the
same side as E-Box.
8. Swap FRONT panel (containing LCD) to the
BACK

Reinstall All Panels

1. Re-route the LCD wiring to the new location
and reconnect LCD screen wiring. Reinstall
panels. (Figure #85)
Panel containing LCD and Bosch Logo must be
installed on the same side as Electrical Box.
Figure # 85
2. Reinstall belts. (Figure#86)
6 720 220 406 (2013/1)
Subject to change without prior notice
SM Series Heat Pump
Figure # 86
SM Series Heat Pump

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents